Some photos of Corryong being Disassembled &
Re-assembled

The Cattle Dog hard at work, or at least thinking
about it, oh.......... What A Life For Some

THREE METER VERANDA






THIS HOME IS TO BE LOCATED AT CORRYONG,THE RIDGE
LOG JUST ABOUT TO BE PLACED ON THE TRUCK

ALMOST HALF WAY

FIRST LOGS BEING PLACED ON SITE

UP TO THE HEADER LOGS

RE-ERECTED SHELL

NOW A COAT OF PAINT AND THE GABLE END FRAMES ARE
INSTALLED

EXPOSED OREGON RAFTERS INSTALLED, AND DOUBLE END
BLOCKED AT THE RIDGE, WE ALSO BOLT THE RAFTERS TOGETHER FOR
SEPARATION AND UPLIFT

THE RAFTERS ARE NOW INSTALLED, WE NOW ADD ANGLE
BRACKETS WHICH ARE COACH BOLTED TO THE PLATE LOG'S ALSO FOR
SEPARATION AND UPLIFT, AND THE END BLOCKS ARE SEALED WITH CAULKING
TO FORM AN AIR TIGHT SEAL

ONCE ALL THE RAFTERS HAVE BEEN FIXED IT IS NOW
TIME FOR THE TIMBER CEILING LINING

NOW WE PLACE THE DUMMY BATTENS TO FORM AN AIR
SPACE FOR THE POLYSTYRENE ROOF INSULATION

R 14 INSULATED POLYSTYRENE SHEETS BEING
PLACED

NOW WE LAY SISALATION PAPER AND BATTEN THE ROOF
READY FOR THE CORONA ROOF TILES

CORONA ROOF TILES BEING INSTALLED

SOME FEATURE STONE WORK TO FINISH OFF THE VERANDA
POSTS

CORRYONG HOUSE FINISHED TO LOCKUP STAGE