Some photos of Corryong being Disassembled & Re-assembled

Hammer-asleep.jpg

The Cattle Dog hard at work, or at least thinking about it, oh.......... What A Life For Some

corryong14.jpg

THREE METER VERANDA

Internal-3.jpg

Internal-2.jpg

Internal-1.jpg

Fire-place.jpg

Fish.jpg

corryong1.jpg

THIS HOME IS TO BE LOCATED AT CORRYONG,THE RIDGE LOG JUST ABOUT TO BE PLACED ON THE TRUCK

corryong2.jpg

ALMOST HALF WAY

corryong3.jpg

FIRST LOGS BEING PLACED ON SITE

corryong4.jpg

UP TO THE HEADER LOGS

corryong5.jpg

RE-ERECTED SHELL

corryong6.jpg

NOW A COAT OF PAINT AND THE GABLE END FRAMES ARE INSTALLED

corryong7.jpg

EXPOSED OREGON RAFTERS INSTALLED, AND DOUBLE END BLOCKED AT THE RIDGE, WE ALSO BOLT THE RAFTERS TOGETHER FOR SEPARATION AND UPLIFT

corryong8.jpg

THE RAFTERS ARE NOW INSTALLED, WE NOW ADD ANGLE BRACKETS WHICH ARE COACH BOLTED TO THE PLATE LOG'S ALSO FOR SEPARATION AND UPLIFT, AND THE END BLOCKS ARE SEALED WITH CAULKING TO FORM AN AIR TIGHT SEAL

corryong9.jpg

ONCE ALL THE RAFTERS HAVE BEEN FIXED IT IS NOW TIME FOR THE TIMBER CEILING LINING

corryong10.jpg

NOW WE PLACE THE DUMMY BATTENS TO FORM AN AIR SPACE FOR THE POLYSTYRENE ROOF INSULATION

corryong11.jpg

R 14 INSULATED POLYSTYRENE SHEETS BEING PLACED

corryong12.jpg

NOW WE LAY SISALATION PAPER AND BATTEN THE ROOF READY FOR THE CORONA ROOF TILES

corryong13.jpg

CORONA ROOF TILES BEING INSTALLED

corryong15.jpg

SOME FEATURE STONE WORK TO FINISH OFF THE VERANDA POSTS

Doormer-2.jpg

CORRYONG HOUSE FINISHED TO LOCKUP STAGE